Abstract
Urban rail transit engineering is a comprehensive and systematic engineering project, involving a number of types of work and professional. While realizing resource intensive management, it provides a safe, convenient, environmental pro-tection and comfortable transportation service mode for the city. This is such a convenient and efficient project. In the process of project construction, it has the characteristics of large investment, long construction cycle, high investment risk, strong professional construction engineering, complex engineering system, and great impact on the society and construction units. There are a lot of project contents, construction design and urban construction units involved, and in these numerous contents and relationships, they are mainly maintained through multiple contracts involved in the project. Therefore, it is particularly important to discuss the relevant content of the whole process management of the urban rail transit project contract.
Keyword
Urban rail transit; Engineering construction; Project contract; Whole-process management
References
[1] Zhang J. Research on Contract System of Urban Rail Transit Projects. 2020.
[2] Yuan Q. Reflections on Contract Management Models for Urban Rail Transit Projects. 2022.
[3] Zhang B. A Brief Analysis of Contract Management for Urban Rail Transit Projects under the PPP Model. Urban Constr Theory Res. 2021;(020):52-3.
[4] Zhao L. Research on Contract Flexibility of Urban Rail Transit Projects Based on PPP Model. Anhui University of Architecture; 2020.
[5] Wu C, Duan S. Research on key points and measures of contract management for urban rail transit engineering projects. Archit Decor. 2020.
Copyright
© 2026 by the author(s).
This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution-NonCommercial-NoDerivatives (CC BY-NC-ND) license, which permits non-commercial use, distribution, and reproduction in any medium, provided the original work is properly cited and is not modified or adapted.
https://creativecommons.org/licenses/by-nc-nd/4.0/
How to cite this paper
Analyze the Whole-process Management of Urban Rail Transit Project Contract
How to cite this paper: Jin Huang. (2026). Analyze the Whole-process Management of Urban Rail Transit Project Contract. Transportation Engineering and Logistics Management, 1(1), 1-4.
DOI: http://dx.doi.org/10.26855/telm.2026.06.001